Black Friday

Why Buy 300-615 Exam Dumps From Passin1Day?

Having thousands of 300-615 customers with 99% passing rate, passin1day has a big success story. We are providing fully Cisco exam passing assurance to our customers. You can purchase Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) exam dumps with full confidence and pass exam.

300-615 Practice Questions

Question # 1

An attempt to use a global vNIC redundancy template pair results in a service profile that
fails to apply. Which action resolves the issues?

A.

Create the peer names before creating the templates.

B.

Assign the secondary template first, and then set the peer name.

C.

Assign both templates simultaneously.

D.

Assign the primary template first, and then set the peer name



D.

Assign the primary template first, and then set the peer name




Question # 2

After upgrading a client’s fabric interconnect to the latest version, an engineer discovers
that the appliance has lost its entire configuration. Which two locations should an engineer
check to confirm that the appliance had backed up the configuration prior to the upgrade in
order to retrieve the lost configuration? (Choose two.)

A.

Equipment FSM page, InternalBackup stage

B.

Service profiles page, InternalBackup stage

C.

Admin page, PollInternalBackup stage

D.

Equipment FSM page, PollInternalBackup stage

E.

Admin page, InternalBackup stage.



A.

Equipment FSM page, InternalBackup stage


C.

Admin page, PollInternalBackup stage




Question # 3

Drag and drop the Cisco UCS SNMP fault types from the left onto the correct issues on the
right.



Question # 4

Refer to the exhibit.

An engineer must connect N2K-Fex-1 and N5K-Core-1 so that the traffic flow between the
two devices uses load balancing. After inspecting the statistics of the interconnecting
interfaces, the engineer concludes that only one link is used. Which action resolves the
problem?

A.

Configure source-destination load balancing on N5K-Core-1.

B.

Configure each uplink to be a member of a separate LACP port channel.

C.

Configure the pinning max-link as 2.

D.

Configure destination-mac load balancing on N5K-Core-1



C.

Configure the pinning max-link as 2.




Question # 5

A Cisco UCSB-Series Blade Server is configured to boot a VMwareESXi host from an EMC
VNX storage array by using a Fibre Channel SAN. The boot order is confirmed to be
configured as expected but the server fails to boot from the SAN. Which action reserves
the problem?

A.

Set the same WWPN pools for vHBA adapters

B.

Set the boot LUN to the highest LUN ID in the storage array

C.

Set the boot LUN to the lowest LUN ID in the storage array

D.

Set the same WWNN pools for vHBA adaptor



C.

Set the boot LUN to the lowest LUN ID in the storage array




Question # 6

An engineer discovers that an NPV/NPIV uplink experiences a heavy load and plans to add
more uplinks. Which statement about what occurs when the new uplinks are added is true?

A.

Only new connections use the new uplinks automatically.

B.

Paths must be defined before new connections can use the new uplinks.

C.

All connections must be reset before the new uplinks can be used.

D.

New and existing connections use the new uplinks automatically.



D.

New and existing connections use the new uplinks automatically.




Question # 7

An engineer is troubleshooting issues in Cisco UCS Director. Drag and drop the possible
causes from the left onto the correct issues on the right.




Question # 8

Refer to the exhibit.

A PC belongs to VLAN 68 The user experiences a large amount of packet loss when
communicating with hosts that are outside of VLAN 68. Which action resolves the problem?

A.

Replace HSRP with GLBP

B.

Enable the peer-gateway feature

C.

Remove the HSRP configuration

D.

Configure ip arp synchronization on both switches.



B.

Enable the peer-gateway feature


Explanation: I assume that the PC is sending traffic with destination MAC of Nexus
physical interfaces. If more snap shots about this question are available, please share.



300-615 Dumps
  • Up-to-Date 300-615 Exam Dumps
  • Valid Questions Answers
  • Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) PDF & Online Test Engine Format
  • 3 Months Free Updates
  • Dedicated Customer Support
  • CCNP Data Center Pass in 1 Day For Sure
  • SSL Secure Protected Site
  • Exam Passing Assurance
  • 98% 300-615 Exam Success Rate
  • Valid for All Countries

Cisco 300-615 Exam Dumps

Exam Name: Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT)
Certification Name: CCNP Data Center

Cisco 300-615 exam dumps are created by industry top professionals and after that its also verified by expert team. We are providing you updated Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) exam questions answers. We keep updating our CCNP Data Center practice test according to real exam. So prepare from our latest questions answers and pass your exam.

  • Total Questions: 167
  • Last Updation Date: 20-Nov-2024

Up-to-Date

We always provide up-to-date 300-615 exam dumps to our clients. Keep checking website for updates and download.

Excellence

Quality and excellence of our Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) practice questions are above customers expectations. Contact live chat to know more.

Success

Your SUCCESS is assured with the 300-615 exam questions of passin1day.com. Just Buy, Prepare and PASS!

Quality

All our braindumps are verified with their correct answers. Download CCNP Data Center Practice tests in a printable PDF format.

Basic

$80

Any 3 Exams of Your Choice

3 Exams PDF + Online Test Engine

Buy Now
Premium

$100

Any 4 Exams of Your Choice

4 Exams PDF + Online Test Engine

Buy Now
Gold

$125

Any 5 Exams of Your Choice

5 Exams PDF + Online Test Engine

Buy Now

Passin1Day has a big success story in last 12 years with a long list of satisfied customers.

We are UK based company, selling 300-615 practice test questions answers. We have a team of 34 people in Research, Writing, QA, Sales, Support and Marketing departments and helping people get success in their life.

We dont have a single unsatisfied Cisco customer in this time. Our customers are our asset and precious to us more than their money.

300-615 Dumps

We have recently updated Cisco 300-615 dumps study guide. You can use our CCNP Data Center braindumps and pass your exam in just 24 hours. Our Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) real exam contains latest questions. We are providing Cisco 300-615 dumps with updates for 3 months. You can purchase in advance and start studying. Whenever Cisco update Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) exam, we also update our file with new questions. Passin1day is here to provide real 300-615 exam questions to people who find it difficult to pass exam

CCNP Data Center can advance your marketability and prove to be a key to differentiating you from those who have no certification and Passin1day is there to help you pass exam with 300-615 dumps. Cisco Certifications demonstrate your competence and make your discerning employers recognize that Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) certified employees are more valuable to their organizations and customers.


We have helped thousands of customers so far in achieving their goals. Our excellent comprehensive Cisco exam dumps will enable you to pass your certification CCNP Data Center exam in just a single try. Passin1day is offering 300-615 braindumps which are accurate and of high-quality verified by the IT professionals.

Candidates can instantly download CCNP Data Center dumps and access them at any device after purchase. Online Troubleshooting Cisco Data Center Infrastructure (300-615 DCIT) practice tests are planned and designed to prepare you completely for the real Cisco exam condition. Free 300-615 dumps demos can be available on customer’s demand to check before placing an order.


What Our Customers Say